Tuesday, June 16, 2015

Week 5: Day 1

Final Presentations!

After 4 weeks of beneficial lectures, site work, office visits and of course quizzes, it was time to present what we have done throughout this fruitful internship. The different site visits and office visits were divided among the two teams. The presentations focused on the structural and architectural finishes of the main projects that we visited, as well as any special finishes. As for the office visits, a brief summary was presented along with the new concepts that we were introduced to. we also talked about the lessons that we have learned during this internship. Of course we didn't forget to show the entertainment part including trips and sports activities. Finally we had some questions that all of us managed to answer along with some comments. However, all in all the presentations were very good and everyone did a great job.
We had the rest of the day to prepare for the final exam which was due the next day.

Monday, June 15, 2015

Week 4 : Day 7

Saturday’s most anticipated event was the tribunal’s decision regarding the arbitration.  Mr. Ian Harper, DCC’s contracts director, discussed how the lack of evidence made the decision harder. The case mimicked a typical dispute between a contractor and a client. Mr. Yabroudi led the contractor’s team while Dr. Clemence led the client’s team. The contractor’s team won the award after the tribunal found that most of the delay was caused by the client .Both teams accepted the results apart some members who claimed that the decision was biased .
The interns had rest  of the day for free time to work on their extensive reports and final presentations.The presentations covered all site visits and activities during the internship .On the other hand , the reports covered all site and office visits throughout the four weeks .

Week 4: Day 6

Friday the 12th was a day off that interns had spent differently. Some had a nice breakfast at IHOP while others prefered a traditional lebanese breaksfast and ordered Manakish. Almost everyone  went for a swim, either on Jumeirah beach or on the pool, either in the morning or in the afternoon. Almost everyone went to the mall, finished their shopping, and had a nice meal and a group of interns stayed and watched Jurassic park at night. In short, the interns made the best out of this free day.

Friday, June 12, 2015

Week 4: Day 5

On June the 11th, the interns headed early to the office where they had quick reviews for the quiz which took place at 11 a.m . After the quiz, team "Client" presented their Counter Claim to the arbitrator Mr.Harper; then, the students had a delicious Lebanese meal for lunch.
The quizzes were handed out and the average was satisfying.

After noon, the preparation for the final presentation started and tasks were distributed between the two groups. 
Finally, a visit was held to the old Souk where the interns enjoyed a boat ride and discovered ancient accessories at the shops. 

Week 4: Day 4

Burj al Salam

On this day, interns ventured to the Burj al Salam, a mixed-use building constructed on Sheikh Zayed Road. The Burj al Salam contains three towers, one a residential building housing 510 apartments, another an office building with 240 shell and core offices, and the third the Sheraton Grand Hotel, which houses 656 rooms. Given the multiple uses of this building, the construction of this building was very complex and required an extensive amount of coordination from Mr. Mazen Hallak, the Project Manager for this project. The visit emphasized the finishes used in the various rooms of the Sheraton Grand Hotel by showing examples of a deluxe suite, executive suite, and presidential suite. Much care was taken in the design and installation of these rooms to ensure that the guests are experiencing the high degree of luxury which Sheraton would like to be synonymous with their brand. For example, the bathtub in the executive suite is oriented faced the television in the next room, and separated from that television by a window with a retractable curtain. A Bose speaker is installed above the bathtub, allowing for guests to enjoy quality television whilst bathing, which is a luxury some of the interns certainly dream of having.

Wastewater Treatment Lecture

In the afternoon, the interns were given a lecture on wastewater treatment by Mrs. Magdalena Hijaz-Ferreira, a Process Engineer at Eagle Electromechanical. This lecture outlined some general information about Eagle Electromechanical, then provided information about what wastewater is, the types of contaminants which can be found in wastewater, and how to treat these contaminants. Solutions such as activated sludge, sequencing batch reactors, and a membrane bioreactor were discussed. 

Week 4: Day 3

Four Seasons Hotel and Resort

On Tuesday the interns visited the Four Seasons Hotel and Resort. The Project Manager, Jihad Choueiri, gave the interns a tour of the building to point out many of its finishes. The luxuriousness of the resort was breathtaking. When you first enter the lobby you are surrounded by a gold mosaic and in front of you is a spiral staircase with hand blown glass railings that are encrusted with gold. The old expression "all that glitters is not gold" does not apply to this resort, everything that glitters is gold. The students also saw columns that were made of book matched marble. Jihad told the interns that each of these columns cost a small fortune and there were at least twelve of them.




Project Feasibility Lecture

When the students returned from the site visit, Mr. Yabroudi gave the interns a brief lecture on project feasibility studies and site assessments. He outlined how critical it was for the client to consider all of the costs related to undertaking a project and how they relate to the expected revenue that the project will make.

Thursday, June 11, 2015

Week 4: Day 2

Arbitration and Bowling

On Monday morning, the students sat in on the first of two lectures on delays, disputes, and arbitration. For these lectures, Mr. Ian Harper, a certified arbitrator briefed the interns on what arbitration is and how it is used in the construction industry. As defined in lecture, arbitration is a way to settle a dispute between a client and contractor without official court involvement.

In the afternoon the student s were presented with a mock arbitration case that they would participate in for the next 4 days. With the simple knowledge of arbitration from the morning, Team 1 and Team 2 were assigned a different role in an arbitration case. Team 1 was assigned to be the client and work with Dr. Clemence, and Team 2 was to work with Mr. Yabroudi as the contractor. Directly after the lecture the teams began working on their claims.

After work, the interns went bowling as part of the sports competition. At the competition the B-team came out on top with some impressive efforts and managed to pick up their first win. The previously dominant A-team suffered a tough loss and finished in last place, while the steady S-team finished in second place. 
The MVP of the bowling competition in action.